Transportation

Meridian provided construction management services for over ten years for the multi-phased construction and remodel of the Ted Stevens Anchorage International Airport.

TSAIA Seismic & Security Retrofit, Phase II

Owner
Alaska Dept. of Transportation & Public Facilities

Project Cost
$150 million

Designer
RIM Architects, Inc.

Contractor
PCL Construction Services, Inc.

 

Phase II of the Seismic and Security Retrofit Project at the Ted Stevens Anchorage International Airport continued efforts from Phase I with the same project team, but with an expanded scope and duration of work. Meridian continued to provide resident engineer, mechanical field engineer, electrical field engineer and lead/structural field engineer positions, and the lead field engineer also assumed baggage handling systems responsibilities. Phase II encompassed 279,189 ft2 of the terminal, as well as some fuel line and utility work on the hardstand aircraft aprons. This phase completed the land-side façade reconstruction as well as the remaining western portion of the ticketing lobby (counters, granite flooring, ceiling, lighting, ticketing offices, etc.). Phase II also reconstructed Concourse ‘B’, demolishing the entire second floor (departure gates) and rebuilding it. Beneath the departure gates, all new baggage conveying equipment was installed, including new subgrade belts, X-Ray scanners, sorting belts and a TSA baggage hand-screening room. Structural frames continued to be installed, including carbon-fiber column wraps, as well as major mechanical, plumbing and electrical infrastructure upgrades, including major reconstruction of five mechanical rooms. Significant re-roofing of the terminal areas were also completed. Phase II also involved replacement of finishes in the existing Concourse ‘A’ including ceilings, lighting and flooring.

Similar to Phase I, Meridian interfaced daily with the general contractor, subcontractors, IBC special inspectors, airport facilities staff and the design team. Meridian documented progress, monitored quality, resolved RFI’s and supported change order reviews, reviewed pay applications, coordinated disruptions and actively participated throughout formal commissioning and closeout processes.

TSAIA Seismic & Security Retrofit, Phase I

Owner
Alaska Dept. of Transportation & Public Facilities

Project Cost
$43 million

Designer
RIM Architects, Inc.

Contractor
PCL Construction Services, Inc.

 

Under a subconsultant agreement with Parsons Brinkerhoff, Meridian provided resident engineer, mechanical field engineer, electrical field engineer and lead/structural field engineer positions for the first phase of a major renovation and seismic upgrade of the existing passenger terminal of the Ted Stevens Anchorage International Airport. This phase focused on the 65,448 ft2 core of the terminal, but not the individual ‘A’ & ‘B’ concourses, which would be addressed in Phase II. Scope included complete replacement of both the air-side and land-side exteriors to match the new Concourse ‘C’ vernacular. Significant mechanical, plumbing and electrical infrastructural work was done including replacing two major mechanical rooms and a chiller room. Heavy structural steel frames were installed throughout the building to bring it up to current seismic codes. Finishes in the eastern portion of the ticket lobby were replaced including ticketing counters, ceilings, lighting and new granite flooring. Significant planning and coordination with airport facilities staff was required to coordinate the work and minimize impacts to the ongoing operations.

This project utilized a CM@Risk delivery method, and Meridian was involved in the planning phase, working with PB, the design team, ADOT&PF and the contractor to scope, budget and value engineer the work. A positive team atmosphere was created at all levels to successfully complete this phase of the project. Because this was an existing facility without thorough as-built drawings, there were significant RFI’s and change orders that were resolved. Meridian worked to address these issues at the field level to minimize cost impacts. Meridian interfaced daily with the general contractor, subcontractors, IBC special inspectors, airport facilities staff and the design team. Meridian documented progress, monitored quality, resolved RFI’s and supported change order reviews, reviewed pay applications, coordinated disruptions and actively participated throughout formal commissioning and closeout processes.

TSAIA Concourse “C”

Owner
Alaska Dept. of Transportation & Public Facilities

Project Cost
$230+ million

Designer
McCool Carlson Green

 

Contractor
Kiewit

For both Phases I & II, Meridian provided full-time, on-site field inspection and contract/cost engineering services under a subconsultant agreement with Parsons Brinkerhoff for the abatement and demolition of the old Concourse ‘C’ and construction of the new 440,000 square foot terminal building at the Ted Stevens Anchorage International Airport. Phase I included abatement and demolition of the original Concourse ‘C’, soil testing and disposal, new foundations and backfill, drilled caissons, concrete columns, utilities, structural steel erection including columns, trusses and decking. Phase II included additional abatement and contaminated soil removal, and select demolition, new concrete slabs, fireproofing, masonry, interior and exterior finishes, roofing, mechanical, plumbing, electrical, conveyance systems, landscaping, pavement and jet bridge foundations.

Meridian worked closely with PB, the design team, ADOT&PF staff and the contractor to resolve many issues encountered on this complicated project. Significant challenges were encountered due to the 9/11 tragedy occurring during the project, which mandated many design changes. There was also a significant delay in getting the structural permit approved, which in-turn delayed the overall completion date and triggered re-sequencing of certain tasks. Meridian participated in the resolution of these challenges and subsequent claims analyses. Meridian also provided pay application reviews, change order review, disruption planning and involvement with several enabling projects and closeout of the project with ADOT&PF’s

Medium Voltage Duct Bank Replacement

Owner
Alaska Dept. of Transportation & Public Facilities

Project Cost
$3.2 million

Designer
AMC Engineers

Contractor
Vista Electrical contractors & Arctic Electric

As one of the major enabling projects for the construction of the new Concourse ‘C’ project, Meridian (under a subconsultant agreement with Parsons Brinkerhoff) provided resident engineer and field inspection services for this two-phased project at the Ted Stevens Anchorage International Airport. In order to reroute the existing electrical power service, 2,668 linear feet of new medium voltage duct bank was constructed, including conductors, vaults and transformers. The new alignment routed the utility through the operational aircraft aprons of both Concourses ‘A’ and ‘B’. Intense pre-construction planning required the coordination of construction activities with airline schedules and ground crews, while maintaining all mandatory FAA and airport security procedures. Due to a late start in the fall, the work was done on a 24 hour/day schedule until completed. The project was additionally challenged by the prime contractor going out of business during the project, and the surety having to bring in a new contractor to complete the work.

Sectors We Serve

Experience

Oil & Gas
Occupant Relocation
Transportation
Telecommunications
Government Projects
Healthcare
Private & Commercial
Meridian Management has been an integral part of our team on the TERRA project from its inception. Their level of professionalism, team based approach and expertise were, in part, what allowed such a large and complex project with an aggressive schedule to be delivered successfully. Throughout our various project phases Meridian has continually stepped up to the plate and been both team players and team leaders.
“Meridian anticipated complex issues during our 7-month renovation project that we could have never foreseen and did an absolutely outstanding job relocating 17 floors of employees.”
“I hired Meridian for project management on a 1 1/2 year redesign project and what immediately stood out was the quality of their employees. Meridian employees always deliver what they promise, are easily accessible and do an amazing job tracking and scheduling every aspect of the project.”
“RIM has worked with Meridian on numerous projects as a member of our team, and on other occasions they’ve represented our clients. They’re an absolute asset to us when our time and resources are stretched. Meridian can battle through a mountain of paper in short order to ensure we meet deadlines. From construction administration at the UAA/APU Consortium Library to ‘clerk of the works’ for various Anchorage Fire Stations, they’ve become an extension of our company. We’re always looking for an opportunity to work with them again.”
“Our building committee was comprised of volunteers, so we needed someone who could manage the details and communicate on our behalf on a day to day basis. Meridian was like an extension of the committee. They helped set priorities, select contractors and guide the parish with contracts. They were a real force multiplier; they made smart decisions and saved us money.”
“We’ve been working with Meridian as a part of our team for eight years. They’ve provided a considerable amount of excellent professional engineering support to the team. Meridian is a great company and an excellent firm to work with.”
“Meridian has helped and continues to help us accomplish numerous large scale hospital renovation projects without disrupting vital hospital operations. Their project planning and coordination efforts have been crucial in ensuring that our patients continued to receive the highest quality health care as the various hospital areas were upgraded to better serve current needs of healthcare. We have successfully accomplished these objectives with Meridian by our side.”